This is the installation of new asphalt to a previously prepared area. For example, a plumber replacing an inspection lid requires the asphalt around it to be reinstalled. The repair is expected to last more than 10 years.
Process
Identify the prepared patch. (Prepared prior to us attending site)
Apply tack to the patch to ensure increased adhesion.
Apply asphalt and rake to the desired finish height.